@Imperious:
The current system for assigning the values ( costs)Â of IC should stand.
The question is why. I understand how VCP (population) reduces cost of IC but I don’t see why IPC income should.
The “the effort for 30 factories to a 3 IPC territory is the same as 100 factories to a 10 IPC territory” argument.
I can understand the current equation IF all ICs are the same size though.
We’ve introduced IC “size” (IPC output limit) but we haven’t factored it into the IC cost equation.
construction schedule
Thats quite advanced and major.
How long does a turn represent? How long does a round represent?